Introduction
This guide provides a step-by-step process to manage EDI Warehouse Shipment Advice (943 Outbound) and Warehouse Receipt Advice (944 Inbound) in A2000.
EDI Warehouse Shipment Advice (Production Shipments) – 943 Outbound
To send the EDI Warehouse Shipment Advice, you must create a Production Shipment.
- Navigate: Go to Production → Production Shipments or create the production shipment from the Cut/Purchase Order.
Required Details for Each Production Shipment
- BOL/AWB
- Customer
- Double click in the field and select the Customer.
- W/H (Warehouse)
- Double click in the field to select the warehouse code.
- Lookup Warehouse code will populate.
- Click View.
- The warehouse code list will appear.
- Select the warehouse needed.
- Click OK.
- Ship Via
- The Ship Via Master must have a SCAC code, Name, Transport Method, and Pay Method Code.
- Container
- T.A. Date
NOTE: The status must be kept as Transit for all new Production Shipments.
Production Shipment Queuing Options
Navigate to queue documents:
- Go to EDI → Outgoing → Queue and Generate Files for Transmission → Queue W/H Documents → Queue 943 Documents.
Options:
- Leave the default EDI status as ‘Unsent’ to populate all Unsent Production Shipments.
- Select the EDI Status from the dropdown menu.
- Enter a specific warehouse, division, vendor, Production Shipment (Log No.) range, and/or B.O.L. Dates.